Stewardship instrument

What should the estate carry after construction?

Build a first annual operating and reserve scenario from installed capital, water, landscape, technical systems, and service expectations.

Annual stewardship model

Budget beyond construction.

Illustrative annual rangeAnnual stewardship rangeAn educational allowance for routine operation, seasonal care, preventive service, and planned repair or replacement after construction—not the property's total annual ownership cost.

$31,000$48,600Routine stewardship plus a planned repair/replacement reserve
  1. Operations & utilities$11,542
    Illustrative midpoint allocation—not a vendor quote.
  2. Landscape & seasonal care$12,338
    Illustrative midpoint allocation—not a vendor quote.
  3. Pool, equipment & preventive service$9,552
    Illustrative midpoint allocation—not a vendor quote.
  4. Repair and replacement reserve$6,368
    Illustrative midpoint allocation—not a vendor quote.

Excludes property tax, homeowner insurance, financing, household staff, major casualty loss, and residence costs. Use actual equipment, utility rates, service proposals, warranties, and an asset register for property-specific planning.

Optional private introduction

Make stewardship part of design.

The right outdoor-living firm should be able to explain how design decisions affect operation, service access, winterization, maintenance, and long-term replacement.

Request a Registry review

Keep exploring the free planning tools →