Pools and spas
Building, zoning or site-plan review; barriers; electrical, gas, plumbing, drainage, and equipment location.
Seven-area approval navigator
Use this page to find the correct starting authority and the reviews a complete outdoor-estate scope may trigger. It is a route map—not a permit determination for a parcel.
Verify the parcel and governing jurisdiction first. Then map the entire scope across building and zoning, grading and drainage, fire, utilities, right-of-way, and any HOA or design-review body. A permit from one authority does not replace a separate approval from another.
Jump to one location
Prepare the parcel address, a marked-up survey if available, and a short scope list. Include work outside the finished feature: excavation, walls, utility routes, equipment and construction access. Label unknown dimensions rather than estimating them as facts.
Ask the authority: “Which applications and drawings does this complete scope need, which other agencies should review it, and what must be resolved before we submit?” Record the answer, date and any remaining conditions. This is a suggested inquiry—not an application or an approval.
Keep the reply with your preconstruction checklist. For source-checked changes with specific effective dates, see planning updates.
Scope map
These are prompts for the project team. The actual route depends on the property, project, adopted rules, utilities, and authority having jurisdiction.
Building, zoning or site-plan review; barriers; electrical, gas, plumbing, drainage, and equipment location.
Accessory-structure rules; setbacks, height, lot or impervious coverage; structural, fire, utility, and private design review.
Gas, electrical, plumbing, fire-district, appliance-clearance, ventilation, structure, and seasonal operating requirements.
Wall height and surcharge; structural design; land disturbance; drainage; erosion control; guard conditions; easements and setbacks.
Coverage and drainage; deck structure; guard and stair requirements; grading; utilities; private exterior-modification review.
Water district; right-of-way or backflow work; grading and drainage; wildfire or defensible-space requirements; tree and HOA review.
Road authority; driveway and culvert work; gates; right-of-way use; emergency access; staging, deliveries, temporary controls, and restoration.
Area records
Each record separates what the cited source supports from what still requires parcel-specific verification.
Begin with the City of Cherry Hills Village. Pools, pavilions, walls, grading, drainage, impervious area, and accessory structures can follow different review paths, so the complete scope should be mapped before design packages separate.
Which City, fire, water-district, drainage, and private-review paths apply to the complete property scope?
6 project paths · 3 official starting sourcesVerify the parcel, City permit path, grading and erosion-control requirements, and every applicable private design-review body. City approval and association approval are separate obligations; neither replaces the other.
Is the parcel inside the City, which private design body applies, and how much land disturbance will the complete project create?
6 project paths · 3 official starting sourcesStart with Greenwood Village Community Development. The City lists site improvements—including larger concrete or asphalt work, decks, landscaping, patio covers, fences, plumbing, and electrical work—among projects that may require permits, and its residential submittal guidance calls for coordinated site, grading, drainage, structural, and utility information as applicable.
Which City, fire, water and sanitation, HOA, grading, drainage, and trade reviews apply to the complete improvement?
6 project paths · 2 official starting sourcesMany Evergreen and Genesee properties use unincorporated Jefferson County processes, but a mailing address does not establish jurisdiction. Confirm the parcel, fire district, zoning, land disturbance, retaining, pool, access, water, sanitation, and private-covenant path before relying on a generic foothill checklist.
Is the parcel unincorporated Jefferson County, and which fire, road, water, sanitation, well, septic, and private authorities serve it?
6 project paths · 3 official starting sourcesFirst determine whether the parcel is inside the City of Boulder or unincorporated Boulder County. For County parcels, building, land-use, grading, wildfire, fire-district, utility, and private-review requirements may overlap; the cited County material cannot establish the route for a City parcel.
Is the parcel in the City of Boulder or unincorporated Boulder County, and which wildfire zone, fire district, water, sanitation, and prior land-use approvals apply?
6 project paths · 3 official starting sourcesConfirm whether the parcel is inside Golden or unincorporated Jefferson County before using any permit checklist. The City directs applicants to verify municipal status and its WUI map; County parcels use separate Jefferson County building, planning, grading, and wildfire processes.
Is the parcel inside Golden or unincorporated Jefferson County, and which WUI, fire, road, utility, and private-review paths apply?
6 project paths · 3 official starting sourcesBow Mar publishes a two-step sequence: Design Review Board approval first, then the appropriate Town building permit. Landscaping changes and general property changes have dedicated review applications, while street cuts and driveway work can require separate Public Works approval.
Which Design Review Board application, Town permit, fire, water and sanitation, driveway, and private-property obligations apply?
6 project paths · 4 official starting sourcesImportant boundary
Requirements change and can depend on parcel boundaries, overlays, adopted codes, project valuation, wall height, land disturbance, utilities, fire district, drainage, and private covenants. Confirm the current route with the cited authority and qualified project professionals before design or construction commitments.