The DRB meets on the second Tuesday with an advance cutoff.
The Town states that a complete application is due by the 24th of the preceding month and that the homeowner must attend the meeting. DRB approval is valid for 180 days.
Southwest metro estates · Colorado Front Range
Bow Mar’s established residential fabric calls for outdoor work that is generous but controlled: privacy without fortress planting, hospitality without visual noise, and major construction without losing the qualities that made the property desirable.

The right Bow Mar outdoor plan pairs sophisticated privacy and entertaining design with restrained lighting, integrated water management, and exceptionally controlled construction logistics.
Maintained local planning record
Bow Mar publishes a clear two-step sequence: applicable Design Review Board approval first, then the Town building-permit process. The owner should plan around a monthly DRB calendar, document completeness, approval expiration, contractor licensing, construction-plan requirements, and separate driveway or street-cut review.
Current local signals
The Town states that a complete application is due by the 24th of the preceding month and that the homeowner must attend the meeting. DRB approval is valid for 180 days.
DRB approval is published as valid for 180 days, while Bow Mar building permits are published as valid for 360 days. These clocks should appear in the owner schedule.
One organized path
Keep the parcel, approval route, cost plan, and project team in one decision sequence instead of collecting disconnected advice.
See what the cited sources support and what still requires parcel verification.
→02 · Property conditionsScreen the address before design advancesSurface terrain, soil, flood, water, and climate questions from public records.
→03 · Capital and scopeUnderstand what the allocation must carryConnect visible amenities to sitework, infrastructure, consultants, approvals, and reserve.
→04 · Team and deliveryDefine the team before choosing the builderReview professional roles, capability, commercial controls, and coordination responsibility.
→Property-specific priorities
Elevation, lighting, sound, equipment placement, and planting should be modeled from both the owner’s and neighboring properties’ perspectives.
Pools, spas, drainage, irrigation, mature planting, and service access need one coordinated water-management strategy.
Staging and deliveries on established residential streets require a builder capable of disciplined scheduling and neighbor-sensitive site management.
Questions for this location
How will pools, equipment, lighting, sound, elevated sightlines, and gatherings appear and sound from neighboring properties?
Can pool, spa, irrigation, drainage, mature planting, and service access share one water-management and operations plan?
Where will crews, deliveries, waste, protection, and parking be managed without overwhelming established residential streets?
Local decision record
Use this matrix to assemble the complete question set before requesting design or price commitments. It is an owner planning record—not a parcel-specific permit determination.
| Scope | Published trigger to verify | Starting authorities | Evidence to assemble |
|---|---|---|---|
| Pool, spa, or water environment | Exterior property change, pool and barrier work, utilities, drainage, landscape, driveway, or fire review. | Applicable DRB first; Town building and trade permits; fire and utility providers as applicable. | Complete exterior plan, survey or plot plan, pool and equipment, barriers, utilities, drainage, landscape, lighting, access, and materials. |
| Pavilion, pool house, or four-season room | New structure, addition, remodel, exterior change, kitchen, bathroom, structure, or MEP work. | DRB before Town building permit; fire and utility review as applicable. | Correct application, scaled plot and floor plans, roof plan, four elevations, colors and materials, structure, landscape/civil, MEP, soils report, and schedule. |
| Outdoor kitchen or fire feature | General property change, structure, gas, electrical, plumbing, fire, lighting, or landscape impact. | Applicable DRB; Town building and trade review; South Metro Fire as applicable. | Location, materials, appliances, fuel and shutoff, loads, clearances, lighting, drainage, screening, landscape, and service access. |
| Retaining, grading, or drainage | Changed contours, runoff, walls, structural work, landscape/civil scope, or driveway drainage. | DRB and Town building review; Public Works for driveway, culvert, street cut, or right-of-way work. | Scaled plot plan with existing and proposed contours and runoff, wall geometry, structure, soils, drainage, driveway interface, and restoration. |
| Landscape, irrigation, or hardscape | Landscape change, general property change, exterior composition, runoff, lighting, or driveway work. | DRB using the applicable landscape or property-change application; Town and utility review as needed. | Landscape plan, removals and protection, irrigation, materials, grades and runoff, lighting, privacy, utilities, construction access, and establishment plan. |
| Driveway, street cut, or staging | Road cut, driveway repair or replacement involving culvert or drainage, right-of-way work, or construction logistics. | Town Public Works Commissioner; DRB and building review where the work is part of the larger project. | Application, driveway and drainage plan, culvert, street restoration, utilities, access, staging, schedule, and up to 20 days of published processing time. |
Recommended sequence
Confirm the parcel, Town process, private restrictions, utilities, lake-related conditions where relevant, and the complete intended exterior scope.
Prepare one coordinated package for design review rather than submitting isolated pool, pavilion, landscape, and driveway decisions.
Carry approved design conditions into building, trade, Public Works, and construction documents.
Track inspection, restoration, landscape establishment, and closeout obligations through turnover.
Often overlooked
Direct local answers
The Town publishes a two-step process in which the applicable Design Review Board approval comes before the Town building-permit step. Confirm the current application and exact scope with the Town.
It may use a dedicated application, but the owner should still coordinate the full exterior composition. Grades, drainage, lighting, screening, access, utilities, and mature landscape can cross package boundaries.
The Town states that the DRB meets on the second Tuesday of each month and that a complete application is due no later than the 24th of the preceding month. The homeowner must attend for the project to be discussed.
The Town publishes a 180-day validity period for DRB approval and a 360-day validity period for building permits. If construction does not begin or finish within the applicable period, resubmittal or penalties may apply under the published process.
Property planning library
Private introduction
Projects beginning at $500,000 may request a private suitability review and one curated introduction to an integrated outdoor-living firm.