Before approval
Verify the actual selection.
- Shop drawings, engineering, anchors, and erection tolerances
- Approved finish and repair mockup
- Mixture and exterior exposure documentation
- Joint, sealant, drainage, and replacement strategy
Specific material planning profile
Factory-cast concrete with aggregate revealed by controlled abrasion, requiring coordinated panel engineering, anchors, joints, erection, and repairs.

How the five-point scale works
The Registry uses this scale to show how much project-specific specification attention a factor deserves for Sandblasted precast concrete. It is an editorial planning framework, not a laboratory result or product certification. No factors are averaged into an overall grade.
Levels are assigned from two questions: how consequential an unresolved factor could be, and how specific the evidence must be before commitment. They do not predict service life or failure.
Confirm the standard submittal and installation requirements.
Review the factor, but it is unlikely to control the decision by itself.
Give the factor explicit project-specific specification attention.
Resolve the factor before approval because it can materially affect the result.
Require source-, product-, exposure-, or assembly-specific confirmation before commitment.
Specification-attention profile
Every score below belongs to the named factor for Sandblasted precast concrete. It does not describe the other examples in architectural concrete.
Piece geometry, reinforcement, anchors, lifting, transport, bearing, and erection are one system.
Panel joints, sealants, drips, caps, and drainage control water at repeated interfaces.
Aggregate source, depth of exposure, casting sequence, patches, and repairs affect visual continuity.
Exposure classification and saturation still matter despite factory production.
Before approval
Owner questions
Evidence and limits
These sources support the broader material-system principles. The five-point values are contractor-informed Registry editorial judgments under the published rubric; the sources do not assign those numbers. Current manufacturer literature, project specifications, source-specific test data, and local requirements must govern the actual selection.
Read the Registry methodology →