← Performance atlas

Exterior system evidence record

Waterproofing & drainage interfaces

The most consequential exterior failures often occur where systems meet: walls and paving, planters and structures, pools and decks, roofs and masonry, or membranes and penetrations.

Exposure lensesExposure lensesThe conditions most likely to influence this material system's durability, detailing, or upkeep. They do not grade or approve a product.
  • Hydrostatic pressure
  • Freeze–thaw
  • Movement
  • Concealed moisture
Plain-English terms used in this record
Assembly
The complete built system—not only the visible finish. It can include structure, backing, membranes, fasteners, joints, drainage, and adjacent materials.
Substrate
The surface or supporting material underneath the finish, coating, membrane, or adhered product.
Interface
The place where two materials, trades, or systems meet. These transitions often need explicit drainage, movement, and responsibility details.
Mockup
A small sample installation used to approve appearance, workmanship, joints, transitions, or performance before the full installation proceeds.

Research-supported principles

What this means for an owner.

  1. 01

    Water should be managed through a continuous path from collection to drainage or discharge.

  2. 02

    Penetrations, terminations, changes in plane, and transitions between trades require explicit responsibility.

  3. 03

    Access for testing, observation, maintenance, and repair should be planned before finishes conceal the work.

Project-team questions

Resolve before products are ordered or the work is covered.

  1. Who owns each transition and how is continuity documented?
  2. Where can water drain if a primary surface or sealant joint admits moisture?
  3. What testing and photographic record will exist before concealment?

Federal evidence record

Open sources used

Source credit identifies the research record. It does not imply agency authorship, endorsement, product approval, or a parcel-specific conclusion.

GSA · Building envelope guidanceNational Park Service · Moisture in buildings

Verification boundary

What still belongs to the project team

Confirm the actual product, source, testing, exposure, substrate, fasteners, anchors, coatings, compatible adjoining materials, installation instructions, mockups, warranties, maintenance plan, jurisdictional requirements, and responsible licensed professionals. The Atlas is an evaluation framework—not a specification.

Read the Registry methodology →